Skip to content
Winner: Best Use of AI in Contract Management, LegalTech Breakthrough Awards 2026 Aavenir Atlas is live: try it on your own contracts for 14 days Contractflow on the ServiceNow Store since 2019 Runs on ServiceNow, or standalone ProcureTech100 2025/26 Pioneering Digital Solution ISO/IEC 27001:2022 certified, SOC 2 Type 2 compliant

Manufacturing

Prices indexed upward promptly and downward slowly

Index formulas, tooling amortization, take-or-pay and liquidated damages, none of them reconciled.

One mark, one agreement. 41 with a contractual cap, 12 increase exceeded the cap.

In one paragraph

Manufacturing runs on long term agreements built from index-linked pricing, volume tiers, tooling recovery and delivery performance terms. Each one creates an entitlement in one direction or the other, and each fails identically: the trigger is a number in the ERP, the term is a clause in a contract, and nothing compares the two.

Worked example

Annual price increase notifications arrive Asked by Category Management

“For each supplier that raised price this year, was the increase within the contractual cap and consistent with the published index movement?”

Overcharged on 17 of 62 suppliers

$1.1M

62 Suppliers raising price
41 With a contractual cap
12 Increase exceeded the cap
5 Index fell, price did not

The increase arrives as a price notification, not a disputed invoice. Somebody updates the price in the system and the transaction completes normally.

The clauses that matter here

Six commercial clause types specific to manufacturing

Not a generic list. These are the terms that carry money and risk in this sector, and none of them appears on another industry page.

Index-linked pricing and caps

The named index, the lag, the cap and whether the adjustment is symmetric. Asymmetric clauses that only move upward exist and are worth finding.

Volume tiers on long term agreements

Stepped pricing where crossing a tier is an ERP event and the tier is a contract term, with nothing joining them.

Tooling and capital amortization

Tooling cost amortized into unit price that should step down once recovered, and frequently does not.

Liquidated damages for late delivery

A stated daily or per-shipment price for non-performance that almost nobody raises a debit note against.

Take-or-pay commitments

Minimum volume obligations that create liability if unmet and shortfall rights if the supplier under-delivers, running in both directions.

Quality and OTIF remedies

Contractual remedies for quality failure and on-time-in-full misses, measured on a scorecard and connected to nothing.

How it actually goes wrong here

Indexed upward promptly, downward slowly

The clause says price moves with the index. In practice the increase arrives the month the index rises and the decrease never arrives at all, because nobody is checking the asymmetry.

Index against applied price · Twelve months, one long term agreement

The index fell for five straight months. The applied price did not move once. 5 of 62 suppliers show this pattern, and the clause is symmetric in every one of them.

  • Published index
  • Price actually applied

When the question gets asked

Four events that send somebody to the portfolio

A raw material index moves sharply

Which supplier agreements index to it, which cap the increase, and which should pass a decrease back to us?

A tier one supplier is downgraded

Where do we hold tooling ownership, alternate supply rights and termination protections?

A cost reduction target is set

Which agreements have unused minimum commitments, expiring tooling recovery, or renewals inside twelve months?

A supplier misses a delivery window repeatedly

What liquidated damages apply, and do repeated failures create a termination right?

Ask the portfolio

Eight questions in this sector's own language

Answerable from the agreements themselves, each returned with the clause it came from.

The full question library

  • Which long term agreements contain volume tiers we may have crossed without receiving the tier price?
  • Which contracts have index-linked pricing, what is the cap on each, and is the adjustment symmetric?
  • Where a supplier applied an increase, did it match the published index movement and stay inside the cap?
  • Which agreements include tooling amortization that should now have expired?
  • What take-or-pay exposure are we carrying this financial year?
  • Where do we hold liquidated damages rights for late delivery that we have never invoiced?
  • Which supplier agreements carry quality remedies we have never invoked?
  • Which agreements let us reject a price increase or terminate if we do?

2-5% Of supplier spend typically recoverable through a contract compliance program

Bring a manufacturing question we have not listed

Trial teams bring their three hardest portfolio questions and we run them against a sample of their own agreements.

Start Your 14-Day Trial

Frequently asked questions (FAQ)

Manufacturing FAQ

We already have a supplier scorecard. Why this?

A scorecard measures performance. It does not tell you what the contract entitles you to when performance is missed. Aavenir Atlas identifies the remedy, so the scorecard has consequences.

Where should we start?

Top twenty suppliers by spend. In most manufacturers that is 60 to 75% of third-party spend and almost all of the recoverable value.

What if our contracts sit in the ERP rather than a CLM?

Common in manufacturing and entirely workable. Aavenir Atlas reads documents from wherever they live, including a shared drive.

How far back can we claim an over-applied increase?

It depends on the contract and the limitation period. Many teams find it easier to correct forward and negotiate a credit than to pursue several years retrospectively.

Have a question we have not answered? Ask the Expert

Schedule a demo

Start your 14-day Aavenir Atlas trial.

  • 1 A 30-minute Aavenir Atlas walkthrough We start from a real event, such as a price index move, an outage or an acquisition, and show the cited answers.
  • 2 Then 14 days on your contracts Pick a sample of your signed agreements. We load them on our ISO/IEC 27001:2022 certified platform.
  • 3 You keep the findings Every answer cites the clause it came from, so your team can check it before acting.

Prefer to talk first? Contact the team.